Skip to content

UI refinements — consolidated execution plan

Date: 2026-04-18 Scope: executes the 5 design spikes (#813–#817) + 9 already-created atomic issues (#804–#812) for UI refinements across Desktop, LCD, Mobile skins. Source plans: - 2026-04-18-desktop-meters-panel.md - 2026-04-18-receiver-activation.md - 2026-04-18-spectrum-controls.md - 2026-04-18-lcd-display-enhancements.md - 2026-04-18-mobile-ia.md

Approved by user 2026-04-18 with these corrections: - #813 meters: AudioSpectrumPanel is a combined widget (AF FFT + passband + PBT + notch/contour for FTX-1). Preserve intact when moving. - #814 activation: downscoped from hybrid (D) to single M/S control (B). No freq-click activation. + cross-cutting tooltip/typography audit for all buttons (new Issue E). - #816 LCD: add holistic layout redesign spike (new Issue 8.7) that treats dual-VFO as first-class.


1. Full atomic issue inventory (25 issues)

Already created (9 issues, #804–#812)

# Area Title
#804 Desktop idle vs disabled for VFO ops
#805 Desktop ON/OFF → single power toggle
#806 Desktop remove BAR indicator
#807 Desktop move settings gear into StatusBar
#808 LCD warm-dark theme
#809 LCD dim inactive status tokens
#810 Global auto-collapse mode-specific panels
#811 Mobile MAIN/SUB → segmented control
#812 Mobile BRT/REF → gear menu

Derived from spike plans (16 new issues, IDs TBD)

Meters panel (4): - M-A: feat(ui): add MetersDockPanel with Po/SWR/ALC/S tiles — new component, ~180 LOC - M-B: refactor(ui): replace bottom-dock summary cards with MetersDockPanel — migrate combined AudioSpectrumPanel (AF FFT+passband+PBT+notch/contour) to right sidebar as collapsible, ~140 LOC - M-C: feat(ui): add Id/Vd/COMP tiles with capability gating — ~120 LOC - M-D: feat(ui): add peak-hold + SWR/ALC fault highlighting — ~150 LOC

Receiver activation (5, was 4, one added): - Act-A: refactor(ui): remove panel-wide click-to-activate + STANDBY/ACTIVE pill — downscoped, ~25 LOC - Act-B: feat(ui): add ActiveReceiverToggle segmented control — ~140 LOC - Act-C: style(ui): strengthen active/inactive VFO panel treatment — ~50 LOC - Act-D: feat(ui): keyboard bindings m, Shift+M, Shift+S for active receiver — ~80 LOC - Act-E: chore(ui): button discoverability audit — typography + tooltips (NEW, cross-cutting) — ~120 LOC

Spectrum controls (3): - Spec-A: style(ui): spectrum toolbar grouping + separators + visual spec — ~80 LOC - Spec-B: feat(ui): spectrum toolbar tooltips + keyboard shortcuts — ~120 LOC - Spec-C: refactor(ui): move DUAL/MAIN-SUB/SPAN-SPEED digest to VfoHeader bridge — ~180 LOC - (Spec-D stretch — deferred)

LCD enhancements (7): - LCD-8.1: refactor(ui): LCD token cascade + contrast core — ~150 LOC - LCD-8.2: feat(ui): LCD in-display contrast slider strip — ~100 LOC - LCD-8.3: feat(ui): LCD filter-viz wide mode with Hz ruler + markers — ~180 LOC - LCD-8.4: feat(ui): LCD memory/recent-QSY strip — ~160 LOC - LCD-8.5: feat(ui): LCD telemetry strip (VD/TEMP/ID + sparkline) — ~140 LOC - LCD-8.6: feat(ui): LCD Display Mode effects (scanlines, phosphor) [P3] — ~120 LOC - LCD-8.7: design: LCD layout redesign with dual-VFO first-class (NEW, design-spike) — produces docs/plans/2026-04-19-lcd-layout-redesign.md

Mobile IA (5): - Mob-10.1: feat(ui/mobile): chip-scroll IA + ESSENTIALS panel — ~180 LOC - Mob-10.2: feat(ui/mobile): persistent guarded PTT FAB — ~150 LOC - Mob-10.3: refactor(ui/mobile): MORE → SETUP (rare config only) — ~100 LOC - Mob-10.4: feat(ui/mobile): promote RIT/XIT to first-class chip — ~60 LOC - Mob-10.5: chore(ui/mobile): landscape PTT guard parity — ~40 LOC

Total: 9 existing + 16 new = 25 atomic issues.


2. File-touch matrix (conflict analysis)

Key shared files and which issues touch them. Issues listed together cannot run concurrently on the same branch.

File Issues
VfoHeader.svelte Act-B, Spec-C, #806
VfoPanel.svelte Act-A, Act-C, Act-E
VfoOps.svelte Act-B, Act-E
SpectrumToolbar.svelte Spec-A, Spec-B, Spec-C
RadioLayout.svelte M-B, #807, Spec-C (props)
StatusBar.svelte #805, #807
MetersDockPanel.svelte M-A, M-C, M-D
meter-utils.ts M-A, M-D
AmberLcdDisplay.svelte LCD-8.1, 8.2, 8.3, 8.4, 8.5, 8.6, #809
AmberAfScope.svelte LCD-8.1, 8.3
AmberFrequency.svelte LCD-8.1
MobileRadioLayout.svelte Mob-10.1–10.5, #811, #812
command-bus.ts Act-D
keyboard-map.ts Act-D, Spec-B
KeyboardHandler.svelte Spec-B
CollapsiblePanel.svelte #810
theme/ tokens #808, Act-C, M-C

Conflict hotspots: - AmberLcdDisplay.svelte — 7 LCD issues touch it → strictly sequential within LCD track. - MobileRadioLayout.svelte — 7 mobile issues touch it → strictly sequential within Mobile track. - VfoHeader.svelte — Act-B and Spec-C both modify props; Act-B must ship first so Spec-C reuses the prop pattern. - VfoPanel.svelte — Act-A removes old affordance; Act-C polishes; Act-E adds tooltips. Order: A → C → E. - SpectrumToolbar.svelte — 3 spectrum issues touch it → sequential: A → B → C. - StatusBar.svelte — #805 and #807 both modify. Bundle or serialize.


3. Wave plan for parallel execution

Each wave = set of issues that can run concurrently by different agents on different worktrees without file-level merge conflict.

Wave 1 — 6 parallel, independent files

Issue Files Why safe
#807 StatusBar, RadioLayout isolated — moves gear
Act-A VfoPanel (removal only) removal-only, isolated
Spec-A SpectrumToolbar, spectrum-toolbar-logic isolated in toolbar
LCD-8.1 AmberLcdDisplay, AmberFrequency, AmberAfScope foundation for all LCD
Mob-10.1 MobileRadioLayout, new EssentialsPanel, new chip-bar foundation for all Mobile
M-A MetersDockPanel (new), meter-utils new file, isolated

Prerequisite: #807 before #805 (StatusBar ordering), optional. Or bundle.

Wave 2 — 6 parallel, after Wave 1

Issue Depends on Files
#805 #807 StatusBar (sequential with #807)
Act-B new ActiveReceiverToggle, VfoOps, VfoHeader
Spec-B Spec-A SpectrumToolbar, KeyboardHandler, shortcut-hints
LCD-8.3 LCD-8.1 (tokens) AmberAfScope, AmberLcdDisplay
Mob-10.2 Mob-10.1 MobileRadioLayout, new PttFab
M-B M-A RadioLayout, RightSidebar (moves combined AudioSpectrumPanel)

After Wave 2: dock duplication gone, PTT FAB shipped, filter-viz expanded, mobile chip-scroll shipped, contrast control core landed, active-receiver M/S toggle live. Major visible wins.

Wave 3 — 5 parallel, after Wave 2

Issue Depends on Files
Act-C Act-A VfoPanel, tokens
Spec-C Act-B (VfoHeader prop pattern), Spec-B VfoHeader, SpectrumToolbar
LCD-8.2 LCD-8.1 new AmberContrastStrip, AmberLcdDisplay
Mob-10.3 Mob-10.1 MobileRadioLayout
M-C M-A MetersDockPanel, tokens

Wave 4 — 5 parallel

Issue Depends on Files
Act-D Act-B keyboard-map, command-bus, test
Act-E Act-A, Act-C VfoPanel, VfoOps, VfoHeader (tooltip-only)
LCD-8.4 LCD-8.1 new AmberMemoryStrip, qsy-history store, AmberLcdDisplay
Mob-10.4 Mob-10.1 MobileRadioLayout, RitXitPanel
M-D M-A MetersDockPanel, meter-utils

Conflict: Act-E touches VfoPanel (= Act-C). Serialize inside VFO track: A→C→E. So actually Act-E stays in Wave 5.

Wave 5 — parallel

Issue Depends on Files
Act-E Act-C VfoPanel, VfoOps, VfoHeader
LCD-8.5 LCD-8.1 new AmberTelemetryStrip, AmberSparkline, AmberLcdDisplay
Mob-10.5 Mob-10.1 MobileRadioLayout

Wave 6 — design spike + polish

Issue Files
LCD-8.7 produces new plan doc docs/plans/2026-04-19-lcd-layout-redesign.md
LCD-8.6 AmberLcdDisplay, new CSS module

Cross-wave parallel (can start any time, totally isolated)

  • 806 (remove BAR) — VfoHeader but trivial; bundle with Act-B.

  • 808 (LCD theme) — new theme files; prerequisite for LCD-8.6 if overlaps; otherwise independent.

  • 809 (dim inactive tokens) — AmberLcdDisplay; conflicts with LCD track → run as part of Wave 1 or serialized before LCD-8.1.

  • 810 (auto-collapse panels) — CollapsiblePanel + call sites; independent. Any wave.

  • 811 (MAIN/SUB segmented mobile) — depends on Act-B's toActiveReceiverProps adapter. Run after Wave 2.

  • 812 (BRT/REF gear) — spectrum/mobile bridge; after Mob-10.1.

  • 804 (idle vs disabled) — VfoOps styling; run before Act-E tooltip audit.


6 waves × ~5 issues each = ~30 agent-hours of implementation if run 5-wide concurrently.

Each wave uses worktree isolation so 5 agents run in parallel without stepping on each other's branches.

Per issue, the standard pipeline applies: EXPLORE → PLAN (if >20 LOC or protocol touch) → EXECUTE → REGCHECK → REVIEW → TEST → PR.

Suggested concrete rollout:

  1. Approve this execution plan.
  2. Create the 16 new GitHub issues under the two existing epics (#818 implementation, #819 spikes).
  3. Start Wave 1 (6 agents in parallel via /solve-issue invocations in separate worktrees).
  4. On each agent completion: merge PR, kick off next-wave issue that depended on it.
  5. Design-spike LCD-8.7 runs in parallel with Wave 1 by a high-effort opus agent (like the current 5 spikes), producing a new plan doc.

5. Epic structure update

Epic #818 (atomic implementation) gets 22 sub-issues:

  • Original 9 (#804–#812) stay.
  • +13 new implementation issues: M-A…D, Act-A…E, Spec-A…C, LCD-8.1…8.6, Mob-10.1…10.5.

Epic #819 (design spikes) gets 1 new child:

  • +LCD-8.7 (layout redesign spike), after the original 5 spike plans.

(Remaining LCD and Mobile items LCD-8.6 [optional P3] and Mob-10.5 [landscape parity] are P3/P2 respectively.)


6. Open questions — user input needed before issue creation

  1. OK to create all 16 new issues at once? Or batch by wave?
  2. Worktree isolation per agent — confirmed supported by current harness?
  3. Design-spike LCD-8.7 — spawn another opus agent now, or park until first wave lands?
  4. Priorities — any issues you want bumped to P0?
  5. Act-E tooltip audit — limited to VFO area in first cut, or extend to StatusBar + spectrum toolbar + rest of desktop in same issue (likely overflows 3-file guardrail — then split)?